For elevator contractors

ASME A17.1 testing, A17.3 surveys, and category schedules that survive a state audit.

11 inspection types covering category 1 and category 5 testing, fire-service operation, governor and rope, traction and hydraulic systems, escalators, and dumbwaiters. State and local AHJ submission built in.

What is Guspora

Guspora is the business operating system for the trades — six suites that share one record so the field, the office, and the AHJ are looking at the same job.

Code citations

The codes that govern the work.

Citations reference the jurisdiction’s adopted edition, never the latest published edition. The platform treats edition discipline as a trust requirement, not a preference.

  • ASME A17.1

    Safety code for elevators and escalators

  • ASME A17.2

    Inspection guide for elevators and escalators

  • ASME A17.3

    Existing elevator safety code

  • NFPA 72

    Fire-service emergency operation initiating signals

  • State elevator code

    Jurisdiction adoption and local amendments

How elevator runs on Guspora

Built for how the trade actually works.

  • Category 1 and category 5 tracking.

    Annual no-load and five-year full-load testing scheduled per car. The state inspector’s next visit is on the same calendar your dispatcher reads.

  • Fire-service operation discipline.

    Phase I recall, phase II in-car, and emergency-power return tested and signed off. Findings cite the adopted edition of ASME A17.1, not the latest.

  • Governor, rope, and brake records.

    Wear measurements, oil samples, and rope-tension surveys live with the car for the life of the equipment, not in a binder behind the dispatcher.

  • AHJ submission and witness coordination.

    State or local elevator inspector witness scheduling tied to the work-order calendar. Outbound notifications use the recipient the jurisdiction has on file.

Sample inspection types

Pre-built templates the field can run on day one.

  • Category 1 annual test
  • Category 5 five-year test
  • Fire-service phase I and II
  • Emergency-power test
  • Governor and rope inspection
  • Brake and machine inspection
  • Door-operator survey
  • Pit and overhead inspection
  • Hydraulic packing survey
  • Escalator step and handrail
Founding Contractor program

By application only. Extremely limited.

50% off your first three months. 50% off GusporaCam for twelve months. In exchange: daily-use commitment, 48-hour bug reports with screenshots, and a monthly fifteen-minute check-in.

Elevator

Run elevator on the same record as the rest of the business.

Elevator contractors | Guspora™ | Guspora™