Cross-connection control. Backflow testing. RPZ assemblies. Medical gas. Grease traps. Every test, every report, every jurisdiction.
Every plumbing and backflow contractor knows these problems. We built Guspora to fix every one of them.
Water authorities require specific test report formats. Most backflow testers still use triplicate carbon forms, then manually key results into the city portal. One device at a time. Guspora auto-generates compliant reports from your field data before you leave the job site.
Restaurants need grease trap pumping on schedule or they face EPA fines. Tracking accumulation levels, pumping dates, and FOG compliance across dozens of accounts is a spreadsheet disaster. Guspora tracks it all and sends automated reminders.
Every commercial building needs a cross-connection survey, but tracking which devices are where, when they were last tested, and who is responsible lives in binders nobody opens. Guspora maps every device, every hazard, every test — digitally.
Lead and copper testing, Legionella risk assessments, and flushing protocol records demand meticulous sample chain-of-custody and reporting. One missed data point and the report is rejected. Guspora structures every field so nothing gets skipped.
A hospital has backflow devices, medical gas piping, grease interceptors, and domestic water systems — each with different codes and test cycles. Guspora manages all of them in one building record with unified compliance tracking.
Every feature was designed for the contractor at the device, not the office admin entering data twice. From backflow gauges to medical gas outlets — Guspora works the way you work.
Work the inspection your way. Guspora handles the report in the background.
Every checklist item links to the AWWA, IPC, UPC, EPA, or NFPA standard that requires it. Backflow testing per AWWA M14, grease traps per IPC Section 1003, medical gas per NFPA 99. Not generic — code-specific.
Complete an RPZ or DCVA test in the field and the compliant test report generates automatically. Initial test, repair, and final test results flow into one document — formatted for your water authority. Ready to submit.
Scan the tag on any backflow assembly, grease interceptor, or medical gas outlet. Guspora pulls up the full history — last test, deficiencies, service records, and next due date. No searching through binders.
Every deficiency gets logged with severity, code reference, photo evidence, and a correction deadline. Automated reminders go to the building owner and your team until it is resolved.
Every photo is automatically tagged with GPS coordinates, timestamp, and device info. On-device face blurring runs by default — compliant with privacy regulations before the photo even saves.
Every customer gets their own portal showing device status, upcoming tests, deficiency history, and reports. Building owners and facility managers stop calling because they can see everything.
No Wi-Fi in the mechanical room? No problem. Guspora works fully offline on Android. Test backflow devices, photograph grease traps, and complete reports — everything syncs when you get signal back.
Hands-free inspection with Meta Ray-Ban, HK15, or phone-only mode. See checklists in your field of view, capture photos by voice command, and dictate notes without touching your phone.
Connect the tools you already use without burying your team in bolt-ons and exports.
Payment processing and invoicing built in.
LiveVoice calls, SMS reminders, and customer notifications.
LiveTransactional emails and report delivery.
LivePhoto sync for teams already using CompanyCam.
BuildingTwo-way sync for shops on ServiceTitan.
PlannedJobber and Housecall Pro schedule your plumbers. Guspora helps them test backflow devices, document cross-connections, measure grease traps, and generate code-compliant reports from the field — without carbon copies or double data entry.
Every plumbing inspection type in a single system. Code-referenced checklists, standard-specific items, and AI reporting for all of them.
Reduced pressure zone assembly testing including relief valve opening point, first and second check valve tightness, and differential pressure verification.
Double check valve assembly testing for first and second check valve hold-tight pressure. Includes shut-off valve inspection and test cock operation.
Pressure vacuum breaker testing including air inlet valve opening point, check valve closure, and vent operation under back-pressure conditions.
Annual backflow preventer test with certified gauge set. Initial test, repair documentation, and final test results compiled into one compliant report.
Differential pressure test gauge calibration verification. Annual calibration records, gauge accuracy confirmation, and traceability documentation.
Complete fixture inventory including faucets, toilets, urinals, and sinks. Operational testing, leak detection, and ADA compliance verification for accessible fixtures.
Sanitary and storm drainage assessment including slope verification, cleanout accessibility, trap seal integrity, and venting system adequacy.
Commercial and residential water heater inspection. T&P valve testing, anode rod condition, venting verification, seismic bracing, and expansion tank check.
Gas piping system leak detection, pressure testing, connector condition, shut-off valve operation, and appliance gas pressure verification.
Seismic restraint verification for piping, water heaters, and equipment. Bracket condition, anchorage integrity, and flexible connector assessment.
Accessible fixture clearances, grab bar presence, lever handle operation, insulation on exposed piping, and compliant mounting heights.
Measure grease cap thickness and solids depth to determine pumping need. Document percentage-full readings and compare against the 25% rule threshold.
Verify pumping frequency meets local and EPA requirements. Log pump-out dates, hauler manifests, and waste volume for regulatory compliance records.
Inspect inlet and outlet baffles for corrosion, damage, displacement, and proper submersion depth. Document baffle material and structural integrity.
Verify interceptor is properly sized for fixture flow rates. Document GPM capacity, connected fixtures, and any flow rate changes from kitchen modifications.
Complete fats, oils, and grease compliance package including maintenance logs, pumping manifests, best management practices, and employee training records.
Facility-wide survey identifying all actual and potential cross-connections. Document connection type, hazard classification, and existing protection for each point.
Complete inventory of all installed backflow prevention assemblies including device type, manufacturer, model, serial number, location, and installation date.
Classify each cross-connection by degree of hazard — high hazard (health) or low hazard (non-health). Recommend appropriate level of backflow protection for each point.
Maintain and verify annual test records for every backflow device in the facility. Track test dates, results, tester certification, and gauge calibration status.
First-draw and flushed sample collection for lead and copper analysis. Document sample locations, collection times, chain-of-custody, and laboratory results.
Water management program assessment for Legionella risk. Temperature monitoring at distal outlets, dead-leg identification, and water age analysis.
Hot and cold water temperature readings at representative fixtures. Verify hot water systems maintain temperatures above Legionella growth range.
Document flushing procedures for low-use outlets, seasonal buildings, and post-stagnation events. Log flush duration, flow rate, and temperature at each outlet.
Proper sample bottle preparation, collection technique, preservation, and chain-of-custody documentation from tap to laboratory. Compliant with EPA Method 200.8.
Medical gas outlet flow, pressure, and purity testing at each station outlet. Verify correct gas delivery, adequate flow rate, and cross-connection absence.
Master, area, and local alarm panel testing. Verify audible and visual signals for each alarm condition including high pressure, low pressure, and changeover.
Central supply system inspection including manifold condition, cylinder storage, bulk tank levels, compressor operation, and vacuum pump performance.
Standing pressure test on each pipeline zone. Verify system maintains required operating pressure with no detectable leaks over the test period.
Zone valve box accessibility, valve labeling accuracy, and full shut-off operation test. Verify downstream outlets depressurize and alarms activate on valve closure.
All checklists are code-referenced and updated annually. Standard-specific items available for AWWA, IPC, UPC, EPA, and NFPA requirements.
Everyone who touches the job gets their own role-specific view without chasing updates over calls and PDFs.
Your Business Dashboard
Customer Compliance Portal
Jurisdiction Dashboard
Risk Assessment Portal
One building. Many trades. One operating system.
Tap through a real inspection checklist and watch the report workflow in action.
Launch Live Demo ->Founding Contractor is by application only. 50% off your first 6 months of Guspora service, plus 50% off GusporaCam for 12 months. Start with the 14-day money-back guarantee or apply directly.
“Milo protected our family for 10 years. Now he protects yours.”