power

Emergency Generators Inspection Software

Emergency generator testing and compliance per NFPA 110.

5 inspection types • Built-in code checklists • AI-powered reporting

Codes & Standards

NFPA 110NFPA 111NFPA 70& more

Inspection Types

5 inspection types available

Monthly no-load testing
Annual load bank testing
Transfer switch testing
Fuel system maintenance
Battery testing

Platform Features for Emergency Generators

Everything you need to manage emergency generators inspections from start to finish.

Load Bank Testing

Annual load bank test documentation

Monthly Testing

No-load run testing with automatic reminders

Transfer Switch

ATS exercise and testing documentation

Fuel System

Fuel level, quality testing, and delivery logs

Battery Condition

Battery testing and replacement tracking

Run Hour Logging

Track total run hours and maintenance intervals

Why Guspora for Emergency Generators?

NFPA 110 testing checklists for all levels
Load bank test documentation with readings
Transfer switch exercise logging
Fuel quality and level tracking

A Day in the Life

What a typical emergency generators inspection looks like with Guspora.

9:00 AM — Bill arrives for a monthly generator no-load test. He opens Guspora, starts the NFPA 110 checklist, records run time, voltage, frequency, and oil pressure readings by voice. In 15 minutes, the test report is filed, the customer is notified, and next month's test is already scheduled.

See Guspora in Action for Emergency Generators

Try the interactive demo and see how Guspora handles emergency generators inspections. No signup required.