Guspora
Refrigeration & Cold Storage

Refrigeration Inspection Software That Handles the Compliance Too.

Ammonia systems. CO2 cascade. Walk-in coolers. Ice rinks. PSM audits. RMP plans. Every IIAR standard, every EPA rule, every OSHA requirement.

Join the Community
14
Inspection Types
10+
Code Standards
PSM/RMP
Compliance Built In
$0
Per Report

What's Freezing Your Compliance

Every refrigeration contractor knows these problems. We built Guspora to fix every one of them.

PSM Documentation Is 14 Elements Spread Across 14 Binders

OSHA 1910.119 has 14 elements — PHA, operating procedures, mechanical integrity, MOC, incident investigation, training, emergency planning, and more. Each element lives in a different binder or folder. When OSHA shows up, you scramble for hours finding documentation. Guspora keeps every PSM element in one searchable system.

Annual Leak Rate Calculations Require a PhD in Spreadsheets

EPA 608 requires tracking every refrigerant charge and every leak for annual leak rate calculation. Systems over 50 lbs of commercial refrigerant must repair within 30 days if the rate exceeds 20%. You track this across 15 systems on spreadsheets that nobody trusts. Guspora calculates leak rates automatically from your charge/recovery logs.

Ammonia Detector Calibration Records Disappear

IIAR-6 and OSHA require calibrated ammonia detectors with documented calibration records. When the auditor asks for 12 months of calibration records, you dig through filing cabinets. Guspora logs every calibration to the detector equipment record with automatic reminders.

Relief Device Replacement Tracking Is a Guess

IIAR recommends 5-year replacement of pressure relief devices. You manage 200 relief devices across 8 facilities and tracking which ones are due this year is a spreadsheet exercise. Guspora tracks every relief device with replacement schedules and expiration alerts.

Management of Change Documentation Is Always Incomplete

You modify a piping run or replace a compressor. OSHA PSM requires a Management of Change review before the modification. The MOC form is half-filled, the PHA update is missing, and the operating procedures were never revised. Guspora structures the MOC workflow so nothing gets skipped.

Built for the Machine Room, Not the Boardroom

Every feature was designed for the ammonia tech standing next to a compressor at 2 AM, not a software team that Googled IIAR once.

PSM/RMP

PSM & RMP Compliance Management

All 14 PSM elements and EPA RMP requirements in one system. Document storage, audit trail, PHA tracking, MOC workflow, incident investigation records, training logs, and emergency response plans.

Refrigerant

Refrigerant Tracking & Leak Rate

Log every charge, recovery, and leak test. Automatic annual leak rate calculation per EPA 608 formula. Alerts when systems exceed threshold. Digital records replace paper logs permanently.

Vessels

Vessel Inspection Tracking

Shell thickness history with UT measurements and trend analysis. Nozzle integrity, nameplate data, and relief device tracking. ASME BPVC and NBIC compliance documentation.

AI Reports

AI-Powered Inspection Reports

Work the inspection your way. Guspora generates the report with IIAR, ASHRAE, and EPA citations. Ready before you leave the machine room.

Safety Equipment

Emergency Equipment Tracking

SCBA, chemical suits, emergency shower/eyewash, ammonia detectors — every piece of safety equipment inspected and tracked with calibration dates and replacement schedules.

Relief Devices

Relief Device Scheduling

Track every pressure relief device with set pressure, capacity, and 5-year IIAR replacement schedule. Automated alerts before devices are due. Test documentation tied to the vessel record.

Offline

Offline Mobile App

No signal in the machine room? No Wi-Fi in the cold storage warehouse? Guspora works fully offline. Inspect, photograph, log readings. Everything syncs when signal returns.

Equipment

Equipment Lifecycle Tracking

Compressors, condensers, evaporators, vessels, piping — every piece of equipment tracked from installation through decommissioning with full service history and oil/vibration analysis trending.

Not Another Maintenance Tracker

PSM Pro handles compliance documents but has no field inspection tools. TRAKREF tracks refrigerant only. No platform combines ammonia system inspection, PSM/RMP compliance management, refrigerant tracking, and a full business OS in one system.

$0
Per Report
14
Inspection Types
PSM + RMP
Compliance Built In
Offline
Works Anywhere

14 Inspection Types. One Platform.

Every refrigeration inspection type in a single system. Code-referenced checklists with items specific to your jurisdiction's currently adopted codes.

Ammonia System & Compliance

Ammonia System Annual

IIAR-6, ASHRAE 15

Pressure vessel inspection, safety relief valve test/replacement, piping integrity, insulation, leak detection, emergency ventilation, ammonia detector calibration.

PSM Compliance Audit

OSHA 1910.119

PHA review, operating procedures, mechanical integrity, MOC, incident investigation, emergency action plan, training records, contractor management.

RMP Compliance

EPA 40 CFR 68

Risk management plan, offsite consequence analysis, worst-case release scenario, 5-year accident history, prevention program, emergency response.

Emergency Response Equipment

IIAR-6, OSHA 1910.119

Ammonia detectors calibrated, emergency ventilation operational, wind sock, PPE (SCBA, chemical suits), emergency shower/eyewash per ANSI Z358.1.

Equipment & Vessels

Compressor Inspection

IIAR-6, Manufacturer

Oil analysis, vibration analysis, bearing temperature, valve plate condition, motor amps, alignment, coupling, crankcase heater, safety controls.

Condenser Inspection

IIAR-6, Manufacturer

Tube bundle or coil condition, fan motor/blade, VFD operation, water treatment (if evaporative), drift eliminators, basin condition.

Vessel Inspection

ASME BPVC, NBIC, IIAR-6

External visual, internal inspection, shell thickness (UT), nozzle integrity, nameplate data, relief device verification.

Safety Relief Device

IIAR-6, ASME BPVC Sec VIII

Set pressure verification, capacity rating, discharge piping, no isolation between vessel and relief, 5-year replacement, test documentation.

Piping System Inspection

IIAR-6, ASME B31.5

Valve condition and tagging, pipe support and hangers, insulation and vapor barrier, expansion joints, weld integrity, corrosion under insulation.

Refrigerant & Specialty

Refrigerant Leak Inspection

EPA 608, ASHRAE 15

Annual leak rate calculation, leak detection method, repair verification, refrigerant inventory reconciliation, recovery records.

Walk-In Cooler/Freezer PM

IMC Ch 11, Manufacturer

Evaporator coil, defrost cycle, door gaskets, temperature monitoring, floor condition, lighting, condensate drain, insulation integrity.

CO2 Refrigeration System

ASHRAE 15, IIAR CO2 Handbook

High-side pressure rating, relief device sizing, leak detection (oxygen depletion monitoring), machine room ventilation, emergency pressure relief.

Ice Rink System

ASHRAE, IIAR

Brine/glycol quality, floor header condition, compressor performance, ice temperature uniformity, energy consumption benchmarking.

HFC Phasedown Compliance

EPA AIM Act, ASHRAE 34

Refrigerant type and GWP, transition timeline, reclaim/recovery documentation, retrofit assessment, new equipment compatibility.

All checklists reference your jurisdiction's currently adopted codes. IIAR, ASHRAE, OSHA, EPA, and ASME standards are common references — Guspora adapts to local requirements.

Connected Stakeholder Portals

Everyone who touches the job gets their own role-specific view without chasing updates over calls and PDFs.

Refrigeration Contractor

Your Business Dashboard

  • Schedule ammonia system, vessel, and PM inspections
  • Track PSM compliance across all 14 elements
  • Calculate refrigerant leak rates automatically
  • Generate AI reports with IIAR and EPA citations
  • Invoice customers and track payments

Facility Owner

Compliance Portal

  • PSM/RMP compliance dashboard across all facilities
  • Vessel inspection history with thickness trending
  • Relief device replacement schedule and status
  • Refrigerant inventory and leak rate tracking
  • Free portal — your contractor pays for the platform

OSHA / EPA Auditor

Compliance View

  • PSM element documentation readily accessible
  • Training records and operator certification tracking
  • Incident investigation records and corrective actions
  • Mechanical integrity program documentation

Insurance Agent

Risk Assessment — Free

  • Ammonia system compliance records
  • Vessel inspection history and condition trending
  • Emergency response readiness documentation
  • Property Health Score for cold storage facilities

Related Industries

One building. Many trades. One operating system.

Try It Right Now

Tap through a real inspection checklist and watch the report workflow in action.

Launch Live Demo ->

Built for Refrigeration Contractors. By Inspection Professionals.

Founding Contractor is by application only. 50% off your first 3 months, plus 50% off GusporaCam for 12 months. Start with the 14-day money-back guarantee or apply directly.

“Milo protected our family for 10 years. Now he protects yours.”

Refrigeration & Cold Storage Inspection Software | Guspora™